Power Engineering Ltd. employees have worked in almost all thermal power plants located on the territory of Bulgaria as well as at several other big industrial enterprises from different economic sectors.

The thermal power plants located in Maritsa Coal Field – ENEL- Maritsa East 3, Maritsa East 2 and Maritsa East 1 have been our constant customers for years.

Our customers include the following: Zaharni Zavodi (Sugar Plant) Gorna Oryahovitsa and the attached TPP, Lukoil –Neftochim – Bourgas, Kremikovtsi AD, Heat Supply –Sliven, Heat Supply – Kazanlak, etc.



 

Година Customer Short description
2004 TPP Maritsa East – 2 EAD Overhaul of Turbine Set-5 – steam lines
2004 Zaharni Zavodi AD - Gorna Oryahovitsa Overhaul and reconstruction of boilers 1 and 3, type ПК-35-39
2004 Zaharni Zavodi AD - Gorna Oryahovitsa Turbine Set (type ПР-6-35/5/1.2) erection and foundation rework
2005 - 06 TPP ENEL Maritsa East-3 AD Repair of Steam Turbines (type К-200-130-3) and Turbine systems – frame contract
2005 - 06 TPP ENEL Maritsa East-3 AD Repair of feed water pumps (type ПЭ 380-185/200-2) - frame contract
2005 Consortium DSD/RWE Rehabilitation of UNIT 2 of TPP ENEL Maritsa East-3 AD
2006 – 09 ENEL Produzione S.p.A. Rehabilitation of UNIT 1, 3 и 4 of TPP ENEL Maritsa East-3 AD
2006 Zaharni Zavodi AD - Gorna Oryahovitsa Alcohol production line installation
2007 - 09 TPP ENEL Maritsa East-3 AD Preparing of Turbine-Boiler Equipment Maintenance instructions
2007 – 08 Zaharni Zavodi AD - Gorna Oryahovitsa Metal structure prefabrication and erection of Electrostatic Precipitator of TPP
2008 ENEL Produzione S.p.A. Erection of new filters and dosing systems at TPP
2009 TPP ENEL Maritsa East-3 AD Overhaul of Units 1,2 and 3
2009 – 2010 TPP ENEL Maritsa East-3 AD Current maintenance of FWPumps - mechanical part, lubrication oil system, condenser system, backwash filters, pipe lines and valves
2009 TPP ENEL Maritsa East-3 AD Overhaul of CW pumps (CWP-5 and CWP -7)
2009 TPP ENEL Maritsa East-3 AD Reconstruction and repair of heavy-current and low-voltage electric wiring at electric and I & C workshops.
2009 TPP Maritsa East – 2 EAD Overhaul and modernization of  LP - TS7
2010 TPP Maritsa East – 2 EAD Valve reapir - Turbine Set 3
2010 TPP ENEL Maritsa East-3 AD Overhaul of Unit 2 – Turbine equipment
2010 TPP ENEL Maritsa East-3 AD Overhaul of Units 1 and 4 – Turbine equipment
2011 TPP ContourGlobal Maritsa East 3 AD Re-blading of LPR -Turbine 1, 2, 3 and 4.
2011 Siemens Installation and commissioning of mechanical equipment at Cogeneration Plant Plovdiv
2010 - 2014 AES Co. TPP Maritsa East 1 Maintenance service -valves, pumps, turbines, auxiliary equipment
2012 TPP ContourGlobal Maritsa East 3 AD Overhaul of Turbine equipment - Units 2 and 4  
2012 Firma P.U.H  AB-Pemout Overhaul of turbine equipment
2012 TPP ContourGlobal Maritsa East 3 AD Emergemcy repair of LPR and LP - Unit 3
2013 TPP ContourGlobal Maritsa East 3 AD Repair of pumps, oilcooler, condenser - Unit 2
2013 TPP ContourGlobal Maritsa East 3 AD  LPR and LP Repair at Turbine К-225-130-2М - Units -1, 2, 3 and 4
2013 TPP ContourGlobal Maritsa East 3 AD  Turbine Auxiliary Repair - Unit 4
2013 SIEMENS EOOD   Design, Installation and Commissioning of Mechanical Equipment at Cogeneration Power Plant – Plovdiv North
2014 TPP ContourGlobal Maritsa East 3 AD General Overhaul of turbine set at Unit  2- Preparatory activities at HIP 
2014 TPP ContourGlobal Maritsa East 3 AD Ремонт на цилиндър ниско налягане ЦНН с извеждане на ротор ниско налягане РНН на Турбина блок 1
2014 TPP ContourGlobal Maritsa East 3 AD Overhaul of turbine auxiliary equipment at Units 1 and 2.
2014 EVN Bulgaria Toplofikatsia EAD Repair of turbine auxiliary equipment at Thermal Power Plants of EVN Bulgaria Toplofikatsia EAD  
2015 TPP ContourGlobal Maritsa East 3 AD Overhaul of turbine equipment: auxiliary equipment at Unit 2; condenser, main ejector  etc. at Units 1.
2015 NEOCHIM Plc - Dimitrovgrad Reconstruction of process air compressor. Revision and repair of accompanying equipment съпътстващо 
2015 NEOCHIM Plc - Dimitrovgrad Unit 2 - ID fans (ДН 19) mounting 
2015 EVN Bulgaria Toplofikatsia EAD  Repair of turbine auxiliary equipment at Thermal Power Plants of EVN Bulgaria Toplofikatsia EAD
2016 TPP ContourGlobal Maritsa East 3 AD Overhaul of Turbine set - Unit - 1
2016 TPP ContourGlobal Maritsa East 3 AD Overhaul of turbine equipment: auxiliary equipment at Unit 4; condenser, main ejector  etc. at Units 1 and 2
2016 NEOCHIM Plc - Dimitrovgrad Repair of Integrated machine set (КМА-2М) at workshop 630
2017 TPP ContourGlobal Maritsa East 3 AD Overhaul of Turbine set - Unit - 3
2017 TPP ContourGlobal Maritsa East 3 AD Repair of auxiliary equipment at Unit 1. Repair of equipment: condenser, main  ejector  etc. at Units 1 and 3
2017 TPP ContourGlobal Maritsa East 3 AD Repair and maintenance of pumps, feed water pumps and auxiliary equipment  
2017 NEOCHIM Plc - Dimitrovgrad  Revision and repair of Integrated machine set (КМА-2М). Revision of turbine equipment at Turbine station
2017 NEOCHIM Plc - Dimitrovgrad Workshop 608 - Revision and repair of steam turbine K-15-41-1 (process air compressor)
2017 ТЕЦ Ей И Ес - ЗС Марица изток 1 Current turbine maintenance services - Alstom Turbine type  Услуги по текуща поддръжка на турбина - Alstom Turbine type
2017 EVN Bulgaria Toplofikatsia EAD специализирано Repair of turbine auxiliary equipment at Thermal Power Plants of EVN Bulgaria Toplofikatsia EAD
2018 TPP ContourGlobal Maritsa East 3 AD Overhaul of Turbine equipment - Units 1, and 4
2018 NEOCHIM Plc - Dimitrovgrad Revision and repair of Integrated machine set (КМА-2М) at workshop 630
2018 NEOCHIM Plc - Dimitrovgrad Workshop 608/АМ 76-Revision and repair of process air compressor and accompanying equipment 
2018 NEOCHIM Plc - Dimitrovgrad Revision of Steam Turbine ПП-8.6-39/16/6 and accompanying equipment 
2018 Mondi Stambolijski EAD Repair services
2018 Dundee Precious Metals Krumovgrad EAD Installation of metal pipelines (steel and galvanized) at specified by the Contractor places 
2019 TPP ContourGlobal Maritsa East 3 AD Overhaul of Turbine equipment - Units 1, 2 and 4.
2019 NEOCHIM Plc - Dimitrovgrad Revision and repair of process air compressor 
2019 NEOCHIM Plc - Dimitrovgrad Revision and repair of Integrated machine set (КМА-2М)
2020 NEOCHIM Plc - Dimitrovgrad Revision and repair of process air compressor 
2020 NEOCHIM Plc - Dimitrovgrad Revision and repair of Integrated machine set (КМА-2М)
 